SRD Playground & Soccer Field – Coming Summer 2027

Leave Your Legacy: Fundraising for the Future

We invite individuals and partners to be a permanent part of Strawberry Rec’s history. Donors at all levels will receive recognition, commensurate with the level of contribution.

Fundraising poster for a new playground and soccer field, showing donation levels, giving options, and a colorful border of children’s hand-painted tiles with family names and drawings.
Large strawberry-shaped playground structure with green slides on either side, ladders, a climbing wall, and open spaces for climbing. Structure is isolated on a white background.

FEEDBACK: Thank you to everyone who provided feedback on the Version #1 of the playground design. Based on feedback received, we’ve made changes to the design. Please click the boxes below to view Version #2 of the playground design and soccer field images. Note: The Version #2 design images do not have the newly designed Strawberry play structure included. You can see images of the new strawberry (left) by clicking the box below.

If you would like to submit feedback, please make sure to indicate if you are commenting on Version #1 or Version #2.

Based on your feedback, we made many changes to the first playground design. Tell us what you think…

Take the survey and let us know what you think of the new design.

We made the following changes: New Strawberry play structure design (see buttons above), added shade and picnic tables, new accessible play structure, more neutral color scheme, two unit ADA restroom with water fountains.

Aerial view of a vibrant green playground with various play structures, slides, and climbing equipment, surrounded by tennis courts and grassy areas.

FAQs:

The project estimated completion date is June 2027

The cost is approximately $2.5 Million

The layout to the right is the Version #2 design. The red outlines are fall zones required for each piece of equipment.

Strawberry Recreation District has started a fundraising campaign, with the goal of raising $1 Million to help preserve district funds for future projects, including a new pool building.

A detailed playground site plan displays multiple play structures, labeled areas, pathways, and protective zones outlined in red on a white background.
A wooden mailbox labeled “SRD Community Inbox” stands near a playground with strawberry-shaped playhouses and a soccer goal in the background.

Stay connected…. Want the latest updates on the new playground and soccer field? Join our email list to get exclusive progress reports, project milestones, and community event announcements delivered straight to your inbox.